Private Residence- 12 Random Rd. Pond maintenance and Bank Stabilization

PRC was engaged by the homeowner to assist with a Floodplain Development Permit application. PRC worked with Bailey Professional Solutions (BPS) to conduct a survey of the existing conditions. PRC then developed plans and specifications for bank stabilization and the dredging of the existing pond. PRC prepared the applications required by Cherry Hills Village, the State Engineer’s Office and the United States Army Corps of Engineers. PRC has great working relationships with these agencies and were able to meet with them and discuss the implications of proposed improvements. After successful approvals from all stakeholders, the project was completed. PRC also provided Construction Administrative Services until completion of the landscape installation.