Westside Ave. Action Plan (WAAP)- West Colorado Ave. Design of Water and Sanitary Sewer Replacement

PRC was responsible for the design of the Water Plans and Sanitary Sewer Replacement. PRC worked closely with Town of Manitou, Colorado Springs Utilities, El Paso County and Felsburg Holt & Ullevig (FHU), to prepare Preliminary and Final Construction Documents. The improvements included replacement of 16-inch and 30-inch waterlines as well as 12-inch sanitary sewer line replacement and sewer line rehabilitation (lining). Many of the existing utilities are very old and were not documented or accurately mapped when originally constructed. As such, PRC worked very closely with Wildcat Construction throughout the duration of the project to address unforeseen issues and to adjust designs when necessary.